Shires Extra Long Lead Rope
Shires Extra Long Lead Rope
Available in stock
Durable 3m leadrope with swivel trigger clip for easy handling and reduced tangling—ideal for added reach and control.
Couldn't load pickup availability
Specifications
Specifications
| Brand | Shires |
|---|---|
| Title | Shires Extra Long Lead Rope |
| Product Length | 3m |
Product Details
Product Details
Extra long leadrope with a swivel trigger clip.
3m long

