100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More General Bridles

The Henry James elegant comfort flash bridle is carefully crafted from the finest English Sedgwick leather and features an anatomic headpiece to offer maximum pressure relief thanks to its cut back anatomical design in conjunction with generous light..
From £210.00 (inc. VAT) £175.00 (ex. VAT)
Made from Sedgwick English leather, this neck strap is stitched along the edge and backed with calfskin padding for optimal comfort. The sleek and adjustable design is perfect for every day and competition use and is suitable from cobs up to large ho..
From £50.00 (inc. VAT) £41.67 (ex. VAT)
This elegant Mexican grackle bridle is carefully crafted from the finest English Sedgwick leather and features an anatomic headpiece to offer maximum pressure relief thanks to its cut back anatomical design in conjunction with generous lightweight pa..
From £220.00 (inc. VAT) £183.33 (ex. VAT)
Our in-hand bridle, which is also used by many for showing, is made from American Eco-Friendly Leather. This leather has been produced using processes and chemicals that are better for the environment. The bridle is finished with a plain browband ..
From £68.40 (inc. VAT) £57.00 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo