100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Breeches

Ideal for colder days, Breeze-Up’s Thermal Exercise Breeches are developed to keep you warm and comfortable. Made with the same Teflon coated outer fabric as the Breeze-Up exercise and summer breeches.  Features: Practical and tough Water ..
From £102.85 (inc. VAT) £85.71 (ex. VAT)
The original and popular Australian 3/4 leg jodhpurs with suede seat and knees. Features: Fully lined High quality, soft suede on knees and seat Zip front and studs Zip pockets Belt loops Elastic waist band Durable elastic on cal..
From £86.50 (inc. VAT) £72.08 (ex. VAT)
Our breeches are designed with the exercise rider in mind but are also a popular choice with team chasers and for everyday riding out. Features: Seat and lower leg suede patches Lycra socks Tough wearing High lycra content for shape re..
From £65.00 (inc. VAT) £54.17 (ex. VAT)
From PC Racewear’s Collection these are a stretch riding breech. The fabric is hard wearing brushed denim with lycra, allowing for stretch and ease of movement. Features: Soft brushed cotton fabric Elevated curved waistband at back with co..
From £69.95 (inc. VAT) £58.29 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo