100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Waterproofs

The Ornella Prosperi Unlined Waterproof Trousers are lightweight, durable, 100% waterproof and breathable with taped seams. Below is a guide to the sizes (waist size). XS = 23” S = 25” M = 27” L = 29” XL = 31”     ..
From £49.50 (inc. VAT) £41.25 (ex. VAT)
Similar to Ornella’s Mud Race Breeches these are made of the same waterproof, rubberised fabric but are designed with a longer leg to go over the top of your boots. Ideal for particularly bad weather. Velcro fastening at the ankle and adjustable w..
From £94.95 (inc. VAT) £79.13 (ex. VAT)
The New Breeze Up 'Monsoon' Unisex Jacket is warm, windproof, breathable and most importantly waterproof! This jacket is ideal for the worst winter days. Combine with the Breeze Up Mosoon trousers for the ultimate protection from the elements. ..
From £89.95 (inc. VAT) £74.96 (ex. VAT)
The New Breeze Up 'Monsoon' Trousers are windproof, breathable and most importantly waterproof! Combine with the Breeze Up Mosoon jacket for he ideal stay dry outfit. Features: Ultra-flexible, high tech, polyurethane material High waterpro..
From £79.95 (inc. VAT) £66.63 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo