100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Wellingtons

Waterproof rubber wellies from Ariat with stylish leather trim details and the usual excellent Ariat fit. Features: Waterproof, vulcanised rubber upper Adjustable leather strap closure and leather trimmed top Shock absorbing EVA mid..
From £135.00 (inc. VAT) £112.50 (ex. VAT)
This insulated version of Ariat’s Burford boots combines the stylish, pratical features of the Burford boot with a 3.5mm Neoprene lining to keep feet warm and comfortable in colder conditions.  Features: Waterproof, vulcanised rubber up..
From £155.00 (inc. VAT) £129.17 (ex. VAT)
This insulated version of Ariat’s Burford boots combines the stylish, pratical features of the Burford boot with a 3.5mm Neoprene lining to keep feet warm and comfortable in colder conditions.  Features: Waterproof, vulcanised rubber up..
From £155.00 (inc. VAT) £129.17 (ex. VAT)
The iconic Chasseur are handcrafted, premium neoprene lined, zip up wellington boots.  Features: Aramid fibre reinforcement to the front for extra protection against abrasion Rugged waterproof Riri Aquazip and snap button for fastening I..
From £330.00 (inc. VAT) £275.00 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo