100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Eventing Accessories

Adjustable elastic arm band complete with medical card. Securely carries your medical details with you as you ride. ..
From £4.50 (inc. VAT) £3.75 (ex. VAT)
Look smart in competitions with Equidisc bridle number holders. Easy to use and clear number display. Slots onto throat lash or can be attached using the new elastic ties.  Fits flat and rolled leather bridles and straps upto 20mm. 3 number ..
From £15.50 (inc. VAT) £12.92 (ex. VAT)
Look smart in competitions with Equidisc bridle number holders. Easy to use and clear number display. Slots onto throat lash or can be attached using the new elastic ties.  Fits flat and rolled leather bridles and straps upto 20mm. 4 number ..
From £15.99 (inc. VAT) £13.33 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo