100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Lycra Pull Ups

Ornella Prosperi tubular leg sleeves are used in racing under riding boots although can be used in any equestrian discipline. Features: Made from 75% nylon with elastic and spandex Comfortable fit with elasticated, non slip hem a..
From £19.99 (inc. VAT) £16.66 (ex. VAT)
Ornella Prosperi lycra leg sleeves are used in racing under riding boots although can be used in any equestrian discipline. Features: Shiny lycra finish Can be used under any riding boot One size only. ..
From £19.99 (inc. VAT) £16.66 (ex. VAT)
Seamless elasticated pull-ups made of soft 4-way stretch, durable fabric. Silicone grips on the inside prevent slippage and the compression tube gives a perfect tight fit. ..
From £19.99 (inc. VAT) £16.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo