100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Hats

Chosen by the most important jockeys in horse racing around the world and riders in cross country, the UoF Race Evo riding helmet is proving to be the latest must have. Designed and produced entirely by hand in Italy, this helmet is designed to offer..
From £275.00 (inc. VAT) £229.17 (ex. VAT)
Chosen by the most important jockeys in horse racing around the world and riders in cross country, the UoF Carbon XRS riding helmet is becoming ever more popular in the equestrian industry. Designed and produced entirely by hand in Italy, this helmet..
From £635.00 (inc. VAT) £529.17 (ex. VAT)
This KEP SMART helmet is the entry level helmet from KEP Italia. This stylish helmet combines unique technology with ultimate comfort and safety to make it a popular arrival on the market. Features: Lightweight yet strong outer shell KEP A..
From £315.00 (inc. VAT) £262.50 (ex. VAT)
100% designed and made in Italy, the CROMO 2.0 model is the evolution of the original CROMO helmet. Features: Polycarbonate outer shell is both lightweight and resistant KEP AIR CONTROL SYSTEM is enhanced with additional ventilation slits ..
From £595.00 (inc. VAT) £495.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo