100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Lunging

1.25" white tubular web lunge line. This line has a buffalo leather buckle end for connecting to the lunge cavesson with a heavy duty swivel to prevent the line from tangling. A buffalo leather chape reinforces the join between swivel and line. There..
From £46.50 (inc. VAT) £38.75 (ex. VAT)
1" continental web lunge line, thinner than our standard white lunge lines to allow the line to travel more smoothly through D rings.   Features: Buffalo leather buckle end for connecting to the lunge cavesson Heavy duty swivel to preve..
From £72.00 (inc. VAT) £60.00 (ex. VAT)
Soft tubular nylon web lunge rein featuring swivel trigger clip at one end and hand loop at the other. 8 meters in length. ..
From £9.99 (inc. VAT) £8.33 (ex. VAT)
A high quality polypropylene webbing lunging roller with a soft neoprene lining for added comfort. Features: Double buckle girth Coated webbing straps Nickel plated dee rings for endless configuration options Neoprene lined. Black..
From £79.99 (inc. VAT) £66.66 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo