100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Outline Training Aids

Elastic training aid that gently encourages correct head carriage by applying light pressure at the poll. Features: Easy to fit Elastic passes through the bit and clips on to either the saddle D-rings or girth Made from 6mm tubular elast..
From £10.99 (inc. VAT) £9.16 (ex. VAT)
Also know as a French Martingale, this clever training aid places a gentle, downward pressure on the bit only when the horse raises his head too high, encouraging rather than forcing him into an outline. Features: Rubber bungee section stret..
From £31.50 (inc. VAT) £26.25 (ex. VAT)
The Harbridge has proved invaluable for all disciplines and abilities, since it imitates the perfect pair of hands. Testing has shown the Harbridge to be very useful for trotting poles, grid work and small fences since it aids concentration and great..
From £14.99 (inc. VAT) £12.49 (ex. VAT)
Synthetic girth loop from Zilco designed to loop over the girth and allow you to attach training aids, martingales and other clip ended attachments to the girth as required. One size. ..
From £6.75 (inc. VAT) £5.63 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo