100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Clipper Blades and Accessories

A specially formulated, high quality blade cleaner from Liveryman for all types of clippers designed for the professional user. Eliminates left over hairs and accumulated dirt in a quick and easy fashion whilst maintaining the best quality lubricatio..
From £4.95 (inc. VAT) £4.13 (ex. VAT)
Liveryman’s specially formulated blend of pharmaceutical grade lubricant with antiseptic for cleaning and lubrication for all clippers. Spray can for easy application. 200ml         ..
From £4.95 (inc. VAT) £4.13 (ex. VAT)
A specially formulated blend of pharmaceutical grade lubricant with antiseptic for cleaning and lubrication for all clippers. 250ml         ..
From £6.55 (inc. VAT) £5.46 (ex. VAT)
Replacement A2 Fine blades from Wolseley. Packed in a handy storage tin. One set.   ..
From £72.50 (inc. VAT) £60.42 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo