100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Buckets

This 18ltr bucket from Stubbs has been designed with a flat back and shaped handle to allow wall hanging and well as making it easier to carry against your leg once full. Made from heavy duty moulded plastic and a thick galvanised handle. Heigh..
From £29.95 (inc. VAT) £24.96 (ex. VAT)
The Small Shallow Gorilla Tub® 15L (previously known as Tubtrugs) is a flexible and weather resistant tub that is built to last. You can use this tub for everything and it makes in ideal feeding bucket for horses and ponies! The golf patterned handle..
From £7.95 (inc. VAT) £6.63 (ex. VAT)
The Small Gorilla Tub® 14L (previously part of the Tubtrug® range) is a flexible and weather resistant tub that is built to last. You can use this tub for everything! The strong 'golf ball' handles make Gorilla Tub® easy to grip and carry even heavy ..
From £4.95 (inc. VAT) £4.13 (ex. VAT)
The Medium Gorilla Tub® 26L (previously part of the Tubtrug® range) is a flexible and weather resistant tub that is built to last. You can use this tub for everything! The strong 'golf ball' handles make Gorilla Tub® easy to grip and carry even heavy..
From £6.85 (inc. VAT) £5.71 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo