100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Tail Guards

Soft, flexible neoprene tail guard designed to protect from above top of the tail right to the end of the dock.No sagging and comfortable for the horse. Features: 4mm closed cell neoprene Ergonomic design for easy positioning and fit Plu..
From £20.00 (inc. VAT) £16.67 (ex. VAT)
Designed to keep the horse's tail clean and tangle free during travel or for showing. Featuring an adjustable flap which allows the tail to hang freely or be fully enclosed. This open-ended design also makes it very easy to put on. Manufactured fro..
From £7.00 (inc. VAT) £5.83 (ex. VAT)
This padded tail guard protects your horse's tail comfortably. The pull through tail bag helps keep your horse's tail tidy and clean. The tail guard features four touch close straps with elastic inserts to allow for a secure fit. ..
From £11.50 (inc. VAT) £9.58 (ex. VAT)
A nylon outer and padded inner make this easy to care for tail guard protective and comfortable. Four touch close straps feature elastic inserts to allow for a secure fit. ..
From £7.99 (inc. VAT) £6.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo