More Brushes and Combs
Stablemate’s classic Equerry XLH body brush has a lightweight leather backing with a leather strap and is filled with a black hair mix.
192mm x 130mm
..
From
£24.00
(inc. VAT)
£20.00
(ex. VAT)
Synthetic block dandy brush from Stablemate.
Plastic back with synthetic bristles.
..
From
£6.95
(inc. VAT)
£5.79
(ex. VAT)
Flicky or soft dandy brush from Stablemate.
Extra long bristles for removing dust and dirt.
Plastic back with synthetic bristles.
..
From
£7.95
(inc. VAT)
£6.63
(ex. VAT)
This Mexican Whisk or Salmon Dandy brush is a popular staple in many grooming kits.
Beechwood backing with a mexican whisk bristles.
..
From
£11.99
(inc. VAT)
£9.99
(ex. VAT)